TwinTurbo.NET: Nissan 300ZX forum - Re: Could have droped its learned values if it was all dead
People Seeking Info
 
   


     
Subject Re: Could have droped its learned values if it was all dead
     
Posted by chinaoreo on May 01, 2019 at 9:35 AM
  This message has been viewed 326 times.
     
In Reply To Could have droped its learned values if it was all dead (n/m) posted by kickerzx on April 30, 2019 at 02:36 PM
     
Message update.:: problem still exist. i have found that upon cold start engine is a tad rough for a minute or 2 then it smooths out. also blipping the throttle there is a very slight stumble before rpms pick up. strangely enough unplugging the grey TPS plug helps both of these considerably. throttle response when blipping is crisp and immediate like it should be. the idle is still dipping down to about 500 then leveling off after revving though..do u think my tps is going bad..?

     
Follow Ups  
     
Post a
Followup

You cannot reply to this message because you are not logged in.