I have been studying the electrical circuit along with the hydraulic circuit.but haven't came to a conclusion if I can design a line lock with the existing ABS unit or not. At first glance it looks like a couple of DPDT relays could make it function but I need to study it a bit closer. Also I am trying to locate switches that I can mount under the ash tray lid. I have 3 weeks before I can make it back to the track. With some heat in my tires I believe I can have a 1.6 sec 60' Down from my current 1.8 sec. tanks again for sharing your experience