| Message |
Mind you that we had everything out of the way already, including engine removed. We started with installing both headlight bucket pipes, then installed the intercoolers, back IC pipes, front IC pipes, then dropped the engine in. Not counting the engine drop in and picking up in the morning, we had the rest of the pipes installed in a few more hours. The only head scratching that was going on was the big pipes by the TB's as those were the most difficult to get in, everything else was cake. I'd be surprised if we spent more than 10hrs on everything. If you're adding lunch, beer, dinner, beer, I could see how it would take 20hrs. I'm just counting working time.
 1993 TT. R.I.P. 09.15.2010
|
 |