Been quiet on the forum lately, so here's a million pics of my 2 year project... almost done: Old garage, built in the 50's, had some good Zed times in its unheated space (turbo swap with engine in... leaving the boost leak testers in the intake after a few too many wobbly pops...) Time to die: (Easter Island head bears witness)
9'3" to the bottom of the engineered beam... gives me 6" extra for the lifts with two zeds stacked the way up to Mrs. VorpalZed's domain... I get downstairs: Roll-up doors with wall mount openers for max ceiling clearance: Here come the toy delivery guys:
Rolling bridge jack: Rolling oil drain pan: Bwahahahahaha! It fits! ... with my 6" clearance: full stack: Swinger grotto almost complete: Mrs. VorpalZed's moved in upstairs: Need to finish shop area, paint garage and install tile flooring... all next spring projects. Heated garage and workspace in the winter... what a concept.
|