I have everything completed in the TT conversion except for: 1) downpipe, cats, and cat-back 2) Ground wires from engine harness and put (+) terminal on battery harness 3) BOV vacuum lines need to be hooked up 4) shifter needed to be installed 5) And basically anything else needed to start and have in running condition. 6) Walboro Fuel pump
**All parts are included I am willing to pay anyone or place that can handle this small project. If you are able to complete the work but dont have space or a shop the car is located at a shop that can have a lift accesible if needed
Follow Ups
Looking for a credible person or shop in MD 2 finish up my Z - BadAzZ3213:34:41 08/12/08