 |

  |
 |
| |
|
|
| Subject |
2nd, i thought i was quick ~20 hours... |
 |
| |
|
|
| Posted by |
musky on September 19, 2006 at 9:43 PM |
 |
| |
This message has been viewed 40 times. |
 |
| |
|
|
| In Reply To |
A full swap in 13 hours? posted by ZJeweler on September 18, 2006 at 11:37 AM |
 |
| |
|
|
| Message |
i had to get it done and out of my friends shop since i was tying up a lift. I installed all the intercooler/piping, ac condensor, and oil cooler/tubing in my driveway in one afternoon. I towed the z to my friends shop in the morning and got the NA motor pulled, and the tt motor set in, and the tranny, exhaust etc installed. That was about a 10 hour day. The third day was about 5 hours getting all the wiring done, boost controller installed, and the bumper back on so i could drive it home. i was amazed it went as smooth as it did with the multi-month horror stories you read about on here.
|
 |
| |
|
|
| Follow Ups |
|
|
| |
|
|
Post a Followup |
You cannot reply to this message because you are not logged in.
|
|
| |
|
|
| |
|
|
|